Reconstruction of the hot water line

Reconstruction of the hot water line
Reconstruction of the hot water line

Project location: ul. Slezská, Hradec Králové

Year of realization: 2020

Amount of investment in CZK without VAT: 13 200 000

Year energy savings in %: Neudáno

Year financial savings in CZK: Neudáno

Reconstruction of the existing canal hot water line, which was replaced by a pre-insulated distribution DN 200-DN 250 with a route length of 490 m, was carried out in the heat supply system of Elektrárny Opatovice, a.s. in Slezská Street in Hradec Králové.

The delivery also included all earthworks and construction work, project work, engineering and geodetic work.