The Reconstruction of Thermoservis distribution
![The Reconstruction of Thermoservis distribution](../reference_obr/male_IMG_20180915_120015_134139.jpg)
![The Reconstruction of Thermoservis distribution](../reference_obr/male_trubky_mensi_093613.jpg)
Project location: Nymburk
Year of realization: 2018
Amount of investment in CZK without VAT: 54 700 000
Year energy savings in %: N/A
Year financial savings in CZK: N/A
The project included the reconstruction of the existing steam distribution system to a pre-insulated hot-water distribution system with a total pipe length of 3,740 m, construction of a central steam / water transfer station with an output of 13.6 MW, implementation of 3 district pressure-independent transfer stations and 22 building transfer stations.
At the same time, the reconstruction of the secondary hot-water distribution system from the district transfer station in the Jankovice housing estate was completed, the piping length was 2,480 m. Implementation took place in the off-season season with minimal shutdowns.