Project location: České Budějovice

Year of realization: 2019

Amount of investment in CZK without VAT: 17 000 000

Year energy savings in %: neudáno

Year financial savings in CZK: neudáno

The aim of the project was realization of new hot-water piping for selected pavilions of the hospital in České Budějovice. Within 4 months, ENESA has built a main 2.1 MW steam / hot water heat exchanger station, a new underground pre-insulated hot water line, including individual connections of 764 m in length, and an object transfer station in the transfusion and pathology departments. Along with the hot water pipeline HDPE DN 40 pipes were put into the joint excavation.

The delivery also included a new system of measurement and control and design work.